汽车,2007(6):140-143.
DENG Jisheng,XU Renping,WU Congshi,et al.Discussion on tunnel construction method of long span tunnel[J].Highways & Automotive AppLications,2007(6):140-143.
[11]冯晓光,任建喜,谷拴成,等.公路隧道围岩现场快速分级方法研究[J].西安科技大学学报,2013,33(3):277-283.
FENG Xiaoguang,REN Jianxi,GU Shuancheng.Onsite rapid classification method of surrounding rock in highway tunnel[J].Journal of Xi’ an University of Science and Technology,2013,33(3):277-283.[12]余存鹏.明娅子软岩隧道围岩稳定性评价[J].西安科技大学学报,2012,32(6):706-712.
YU Cunpeng.Stability analysis of surrounding rock of Mingyazi soft rock tunnel[J].Journal of Xi’ an University of Science and Technology,2012,32(6):706-712.